HomeRenovations › Bathroom Renovations
Cube Renovation · Bathrooms

Bathroom renovations, done right behind the tiles.

Strip-out to handover in 4-8 weeks. Plumbing, waterproofing, tiling, fittings - handled by one team, finished to NHBRC standards.

200+Projects completed
30+ yrsConstruction expertise
NHBRCAccredited member
12-monthWorkmanship guarantee
Why bathrooms are 90% what you don't see

What's behind the tile decides whether your renovation lasts 5 years or 25.

A great bathroom is a plumbing job dressed up in beautiful finishes. We do the boring stuff right first, then we make it look good.

Waterproofing included

Every bathroom renovation includes a full waterproofing membrane under the tile. Not a quick coat. A proper system with a 10-year warranty.

Plumbing relocations done once

If you want the bath against a different wall, we move it now, properly, with new pipe runs.

No half-tiled walls

When we move plumbing, the tile gets replaced wall-to-wall. No mismatched seams.

Scope

Full-scope bathroom renovation

Concept to handover, under one contract.

Strip-out

  • Removal of old sanitaryware, tiles, vanity, taps
  • Safe disconnection of plumbing & electrics
  • Disposal & site protection

Substrate work

  • Replumbing (relocations, new copper/PEX runs)
  • Electrical (lights, extraction, heated towel rails)
  • Replastering walls and screed
  • Floor levelling

Waterproofing

  • Liquid membrane to walls (full-height in showers)
  • Membrane to floor with upstands
  • Drain detailing
  • 10-year warranty

Finishing

  • Wall & floor tiling
  • Grouting & silicone
  • Sanitaryware install
  • Taps, mixers, accessories
  • Vanity install
  • Paint touch-ups

Hand-off

  • Snag list
  • Joint walk-through
  • 12-month workmanship guarantee
  • + 10-year waterproofing warranty
Honest numbers

Timeline and cost ranges

Indicative from recent quotes. Real numbers come after a site visit.

Timeline from sign-off

  • Strip-out & substrate: 1-2 weeks
  • Waterproofing & tiling: 1-3 weeks
  • Fittings & finishing: 1-2 weeks
Total: 4-8 weeks

Cost ranges

Refresh
Paint, fittings, replacement tiles.
R40k-R100k
Standard
Full strip, replumb, retile, new sanitaryware.
R100k-R220k
High-spec
Premium fittings, custom shower, underfloor heating.
R220k-R500k
Service area

Bathroom renovations across the northern suburbs

Local team. Fast response. No travel surcharges.

Also covering · Atholl · Morningside · Hyde Park · Houghton · Illovo · Linksfield · Rosebank · Saxonwold · Parkhurst

FAQ

Questions homeowners ask

Before every bathroom renovation, this is the conversation.

How much does a bathroom renovation cost?
R40,000 for a refresh, R100,000-R220,000 for a standard full renovation, more for high-spec. Sanitaryware and tiles are the two most variable line items.
Can we still use our other bathroom during the work?
Yes - we dust-protect the work zone. If it's your only bathroom, we can sometimes phase the work, but it usually adds 1-2 weeks.
Is waterproofing extra?
No. Every Cube bathroom renovation includes full-system waterproofing with a 10-year warranty.
Can we keep the existing layout?
Yes - that's the cheapest path. Most renovations are about new finishes on top of the existing plumbing.
Do you handle the tiling, or do we hire a tiler separately?
We handle it. Same team, single point of accountability.
Heated towel rails, underfloor heating, smart toilets - do you fit those?
Yes, all of it. Just tell us at the quote stage so we plan the wiring and substrate correctly.

Bathroom that's seen better days?

Book a free site visit. We'll measure, scope, and quote properly.